Oh my, I am soooo nerdy.
For an update, I wanted to take a stab at the formula used to calculate production for a given SQM building.
I did a simple linear regression using four data points at 20, 40, 120, and 200 sqm. For your viewing pleasure, it approximates the production you will achieve MUCH better than using 20 sqm equivalents (like saying my 40 sqm will produce around double of what my 20 sqm does).
So, for those of you who know math, this formula takes the form of y=A+Bx. As I get more data points this will be more accurate, but I still have to expand my city as fast as I can, so I will not care too much...
Therefore for lumberjacks (drumroll)
Hourly production estimate = 6.33 + (1.92 * Building SQM)
As you can see by the formula, and if you graph it out, the production for a building cannot be exactly calculated given a sqm, but it is possible that the true formula takes into account the production process level.
Please let me know if these figures fit with your city, and other production lines. My rank is Sir, so that may alter the formula also.
....
Addendum
Data Used (Lumberjacks at Sir)
SQM / Actual Hr prod / 20-sqm equiv / Linear regression estimate
20 / 42.21 / 42.21 / 44.73
40 / 83.59 / 84.42 / 83.13
120 / 241.31 / 253.26 / 236.73
200 / 387.56 / 422.1 / 390.33
As you can see, with large building sizes it is much more accurate than just using the 20-sqm equivalent.
