R2 slight problem

What's going on in Kapilands?
This section is for all about the game itself.

Moderator: moderators

Post Reply
Guest

R2 slight problem

Post by Guest » 27.04.2009, 19:14

Code: Select all

Address	Buildings	Task	Status
Congo:29773	Mine & Well RC S:500 32767 m2	Expansion 5581:43:26
Congo:29176	Chemical RC S:600 31728 m2	Expansion 5581:56:59
I wasn't sure where to post it so I put it here.

When expanding all other buildings the numbers for expansion appear after the word "expand" (like in the example below). Shouldn't it be the same way for the research buildings?

Code: Select all

Congo:40484	Factory E:100 3000 m2	expand to 3000 m2 98:23:47

Guest

Post by Guest » 27.04.2009, 21:58

Well theres nothing gramatically wrong with either of them... your just being fussy :P

I guess it should be the same but personally I think the programmers are more concerned with The new german server and converting it over for english useage :P

Guest

Post by Guest » 28.04.2009, 11:16

Well, it doesn't bother me. They're going to expand either way but I decided to post it.

Guest

Post by Guest » 28.04.2009, 16:24

rado84 wrote:Well, it doesn't bother me. They're going to expand either way but I decided to post it.
Just a tip, :) next time post it in the bug section. :wink:

Guest

Post by Guest » 28.04.2009, 19:00

Well it isn't a bug is it?

There's nothing wrong with it at all.

Guess you could argue you could post it here:
http://www.forum.kapilands.com/viewtopic.php?t=47

Guest

Post by Guest » 04.05.2009, 07:37

Not to make another thread I`ll write it here.

I think it is more to kapitools firefox script not to kapilands, but maybe you have faced the same problem and know how to resolve it. When i go into production administrative building and select all one size buildings and enter time to produce (in time format) 0:24:0 and click execute, then in production screen one building is producing for 24 hours and other shows that is producing for 25 hours. But I set up producing for both buildings the same time from administrative building. Then when i enter production house and cancel work and then enter again 0:24:0, then it is ok. both buildings are in the same area - turkey, and the same workers.

where should be problem?

Guest

Post by Guest » 04.05.2009, 09:26

Hmm..maybe one worker had to go to the bathroom. :lol:
But seriously, what happens if you put it in minutes?
Like 1440 minutes production?
That is how I set the time.
And I never had such changes in productiontime when I set the buildings.
It is strange it doesn't happen when you set it for a second time.

Guest

Post by Guest » 04.05.2009, 10:28

I read soemthing before that kapiscript doesnt work with admin buildings or you need to download a newer version- or something like that :\

Search for it in the forums :P

I would but i have a life :D

Guest

Post by Guest » 04.05.2009, 17:35

Kapiskript works with all administrative buildings fine, but except one, and i noticed it only now. Lets see what happens tomorrow.

Guest

Post by Guest » 04.05.2009, 18:00

is that building optimized? :roll:

Guest

Post by Guest » 04.05.2009, 18:10

He says hes using the time format of kapi script not the production amount so optimisation shouldnt effect it- check anyway

Guest

Post by Guest » 05.05.2009, 07:56

anubis wrote:is that building optimized? :roll:
No it wasn`t. Did optimization and now it works fine. I even didn`t know of that feature optimize. Why is it for and what actually it does?

Guest

Post by Guest » 05.05.2009, 08:12

As you know when you expand any building it loses some prodictivity (a 100m pp wont make as much as 5 20m ones) optimizing gives back a little of that productivity but not all of it
H

Guest

Post by Guest » 05.05.2009, 08:46

Thanks for info :)

Post Reply