[2009-01-28|08:00] 5 Factories 200m

Moderator: moderators

Locked
Guest

[2009-01-28|08:00] 5 Factories 200m

Post by Guest » 25.01.2009, 18:02

The total expansion cost including the 20 employees and building cost are 3,763,400c so:

Minimum Bid: 5,000,000 per Factory --> 25,000,000c for the Bunch
Minimum increase/bid: 1,000,000

Enjoy bidding :)

Guest

Post by Guest » 27.01.2009, 14:06

8)

Locked