Page 1 of 1
Upgrading
Posted: Tue Dec 04, 2007 10:26 pm
by Guest
Does anyone know how one can tell how much production will increase per every 10 square meters?
Posted: Tue Dec 04, 2007 10:46 pm
by Guest
i cant remember the direct link, but i think there should be an "online calculator" on
Kapitools
(it's in german)
just poke around abit, you'll find it.
Posted: Tue Dec 04, 2007 11:39 pm
by Guest
Its roughly 50% ... a little less but not much.
if a 20m makes 100 gogas in 10hours, a 30m 100 gogaa in 10:05 ... just an example.
Posted: Wed Dec 05, 2007 12:25 am
by Guest
Breth wrote:Its roughly 50% ... a little less but not much.
if a 20m makes 100 gogas in 10hours, a 30m 100 gogaa in 10:05 ... just an example.
Sorry, but this looks like a 30m² building needs longer for 100 gogas than a 20m² building. I think you meant something else.
I found no information about this on kapitools.de. For kapilands yes, but not for regnum. But you can find it here:
http://kapiland.dd-hosting.de/kapiregnum/glaskugel.php
Also only in German. And the productivity is determined by the workers, not by m².
Elwood
Posted: Wed Dec 05, 2007 4:55 am
by Guest
elwood74 wrote:Breth wrote:Its roughly 50% more porductivity ... a little less but not much.
if a 20m makes 100 gogas in 10hours, a 30m 150 gogaa in 10:05 ... just an example.
Elwood
Sorry, as Elwood pointed out I was wrong. I corrected it.
My 20m make 1000 wood in around 21:53 hours.
My 60m make 3000 wood in around 22:34 hours.
I am Huckster though so my times may be difernt from someone else.
Posted: Wed Dec 05, 2007 4:12 pm
by Guest
[quote="BrethMy 20m make 1000 wood in around 21:53 hours.
My 60m make 3000 wood in around 22:34 hours.[/quote]
I see you tripled the size of one building while leaving the other at its smallest. I think that it is better to equally upgrade your buildings. If you have 4 buildings, upgrade one while the others are producing, because the total production per employee decreases as you upgrade more.
I upgrade by 10's, one building at a time. After my first has been upgraded, I move to the second. When the last has been upgraded I go back to the first and start again. This way you lose the least amount of efficiency (production per employee) possible, while still increasing your overall production and allod.