quality production
Moderator: moderators
quality production
hi
I try to produce quality chickens.
I have buy Q4 corn and my research building is looking for Q3 chicken (so I have Q2 already).
I launch product and the system says :
[quote]250 Chickens quality 0 is/are now being produced.
Ready in 8 h. 25 min. 0 sec. Production costs: 22.50
I try to produce quality chickens.
I have buy Q4 corn and my research building is looking for Q3 chicken (so I have Q2 already).
I launch product and the system says :
[quote]250 Chickens quality 0 is/are now being produced.
Ready in 8 h. 25 min. 0 sec. Production costs: 22.50
a) You have to manually adjust the quality settings at your animal farm at least once you build it (it is 0 by default, but you can choose the level you want up to max - the research level)
b) most probably you had also corn q0 in your warehouse and not enough q4 for the production quantity you ordered. So q0 was automatically taken from warehouse. If you had enough q4 the system would have asked you which quality to chose (I hope I used the proper tenses in this sentence
)
b) most probably you had also corn q0 in your warehouse and not enough q4 for the production quantity you ordered. So q0 was automatically taken from warehouse. If you had enough q4 the system would have asked you which quality to chose (I hope I used the proper tenses in this sentence

Yeah, for each producing building up top are sections "Help," "Quality Level," "Employees," "Buildings" (for expanding), and "Buildings" (for selling).
When production stops, under "Quality Level" you will have the ability to set it. You should probably just go up to 127 immediately so you don't forget with each upgrade. And do this on each building.
When production stops, under "Quality Level" you will have the ability to set it. You should probably just go up to 127 immediately so you don't forget with each upgrade. And do this on each building.
Only up to the quality of the research. Increasing the number up top beyond the research doesn't cost you more. Try it and see.elder wrote:the higher the quality set the higher the production cost. The increase is small, but there is no sense to pay for something you don't utilize. So set your quality to the research max, not higher.