15000 steel for m^2 !!!!!!!!!!!!!you'll need 10000 Stones, 15000 Steel and 10000 Wood. You can add a maximum of 32407m².
That is 2,025,000 caps on steel alone for every metre.
If i want to max my building out steel alone would cost me 65,624,175,000.
That is 65.6 billion on steel alone just to max one special building.
WTF is going on here?